Start with the operating model
Define seating capacity, dine-in versus takeaway priorities, peak demand, menu type and service style. These choices affect the kitchen layout, dishwashing, deliveries, staff areas and the electrical and plumbing demands.
The brief should also distinguish guest-facing finishes from back-of-house zones that need non-slip surfaces, cleanable materials and durable details.
Keep front-of-house and back-of-house connected
Customer journey
Think through entrance, waiting, billing, seating, washrooms and accessible movement as one experience.
Food movement
Study ingredient receiving, storage, preparation, cooking, service, dish return and waste routes.
Services
Coordinate extraction, fresh air, air-conditioning, grease management, drainage, fire safety and electrical loading before ceilings close.
Acoustics and lighting
Plan comfortable conversation levels and layered lighting without compromising food service operations.
Get technical decisions made before site execution
Coordinate kitchen equipment schedules with the interior drawings. A change from one kitchen appliance to another may affect floor drains, exhaust ducts, electrical demand and fire provisions.
Allow realistic time for material samples, mock-ups, long-lead equipment, inspections and testing. If the project is an operating renovation, decide which spaces can be isolated safely and when work can occur.
Control handover around opening day
Prepare a commissioning and snagging list: exhaust performance, water pressure, drainage, waterproofing, lighting scenes, signage, emergency systems, equipment interfaces and final cleaning.
Confirm relevant permissions and registrations with qualified professionals and the competent local authorities; requirements depend on business model and location.
Checklist before you start
- Seating plan and kitchen equipment list
- Customer and staff circulation plans
- MEP and extraction coordination
- Wet-area waterproofing and drainage plan
- Acoustic, lighting and signage brief
- Commissioning and opening checklist
Free consultation