Look for relevant project experience
A contractor experienced with individual homes may not have the same project controls as one coordinating a restaurant kitchen, an institutional campus or a PEB shed. Ask to see built examples comparable in complexity, services and operational requirements.
Review the actual scope delivered on each reference project rather than relying only on photographs or broad “turnkey” claims.
Compare the offer, not just the price
Scope
What drawings and specifications does the quote follow, and what has been excluded?
Programme
Which stages, long-lead items and approvals affect the critical path?
Project team
Who owns design coordination, quality checks, procurement and day-to-day site decisions?
Commercial controls
How are variations priced, approved and recorded?
Handover
Which tests, warranties, as-built records and defects arrangements are included?
Ask about technical coordination
Commercial projects involve interfaces between architecture, structure, electrical, plumbing, ventilation, fire safety and specialized equipment. Ask the bidder to describe a recent clash they resolved before installation.
A structured drawing register, submittal process and inspection plan help reduce ambiguity even on modest commercial projects.
Make the contract operationally clear
Document milestones, payment triggers, acceptance standards, variation procedures, reporting cadence and responsibility for statutory submissions.
Speak with former clients where possible and confirm who will personally manage your site. Transparency about uncertainties is more useful than unconditional promises.
Checklist before you start
- Comparable completed projects inspected
- Same specifications given to every bidder
- Named project team and reporting process
- Milestone schedule and variation mechanism
- Testing, warranties and defects terms
- Owner, architect and contractor responsibilities
Free consultation